Washington Park Bleachers


Washington Park Bleacher project changed an old style wood and post seating into concrete platforms that fans could bring lawn chairs to sit on. The project became complicated when precast concrete wall sections did not reach the angled corners because of their standard lengths and thicknesses. Many hours were spent by project foreman Dave Donahoo to cut and fit, measure and shove each block into place and pour concrete that came to that same point in space! A storm sewer was installed to drain water from the floor section.
Concrete was furnished by Mobile Concrete. Concrete blocks were from Wyoming Precast Products.. The owner was the City of Casper Recreation Dept. Most of the engineering was by 71 Construction.